You are here: Home » AAC PLANT » AAC block/panel making machine » Autoclaving process
AAC PLANT SOLUTION
Offering whole plant solutions including raw material test, plant layout design, equipment manufacturing, project managment of Autoclaved Aerated Concrete block and panel production line

Products details

This product has been off the shelf!

Autoclaving process

Share to:

For some cold areas, the design of curing tunnel before autoclave can ensure the good quality of the products though controlling the chemical reaction temperature. The curing car transports the cakes into autoclave with temperature 200℃ and steam pressure 1.2MPa, autoclaving cycle is 11H. The tail steam of the autoclave will be recycled into other autoclaves and/or to pre-curing zone by pipe for completely utilization.

For some cold areas, the design of curing tunnel before autoclave can ensure the good quality of the products though controlling the chemical reaction temperature. The curing car transports the cakes into autoclave with temperature 200℃ and steam pressure 1.2MPa, autoclaving cycle is 11H. The tail steam of the autoclave will be recycled into other autoclaves and/or to pre-curing zone by pipe for completely utilization. 


RELATED LINK

More >>
KEDA new website :www.sinokeda.com
Made in China:https:// keda600499.en.made-in-china.com/
Linkedin: KEDA SUREMAKER
INS & Twitter & Facebook: KEDA600499

CONTACT

Address : Lingxiao Road North 555, Economic and Technological Development Zone,Maanshan City,Anhui Province,China 
Tel : 86-555-2113600
E-mail : marketing_ea@keda-suremaker.com

Contact Us Now